Reference

project-metromont-south-carolina

400×400 20 plates

COUNTRY: USA

CLIENT: Metromont

LOCATION: North Carolina

TPH: 0.5

LPM: / GPM:

CYCLES: 3/4

Matec has installed a plant in the concrete sector in South Carolina. It treats the truck washout water, giving back and average of 0.5 TPH in 3-4 cycles per hour.

58
:
days
14
:
hours
41
:
minutes
22
seconds